Projects:
- High Rise Condominium
- Open Z Stair Tower
- Parking Garage
- Multi-Story Hotel
- Parking Structure Open Z Stair
- Hotel Complex Stair Towers
- Townhouse Entrance
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
click for project description |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parking Structures ● Office Buildings ● Multi-Story Apartments & Condos ● Schools
Casinos ● Hotels ● Hospitals ● High Rise Retail ● Stadiums & Sports Facilities |
| |
PRECAST ADVANTAGES
| |
Durable...long lasting construction with low life cycle costs |
| |
Maintenance Free...will not rot, rust or burn |
| |
Cost Effective...speeds up construction, shipped on demand for
immediate installation |
| |
Safe...eliminates the need for temporary stairs during construction |
|
|
 |
| |
|
|
DESIGN CONFIGURATIONS
| |
Projects are designed and coordinated by our professional engineering staff |
| |
Manufactured to meet your needs on state of the art, steel mold systems |
| |
Sizes available up to 78" wide |
| |
Typical Units available up to 21 risers high |
| |
Various Landing Configurations: |
| |
|
Independent Risers & Landings |
|
Monolithic Landings |
|
Open Z Design |
|
OPTIONS
| |
Various connection designs |
| |
Corrosion Inhibiting Admixture available |
| |
Various Non-Slip Nosing options |
| |
Railing Connection plates, pockets or embeds |
|


|
| |
QUALITY |
|
|
| |
| |
Manufactured in a CSA Certified Facility to A.23.4.94 |
| |
Stringent Quality Control Program ensures uniform finish and color |
| |
5000psi/30mpa Reinforced Concrete |
| |
Load rated lifting inserts |
| |
Two hour fire rating standard on all units |
|
|
 |
Please Contact Us if you are interested in using our services.
|